Toyota Soarer Z30 Front Guards Vertex Style Vented Pair FRP Hand Laid

SKU: FG-M1094
MTO Made to Order (Made in Australia)

Shipping Policy

$545.00

Afterpay Logo More Info

Make 4 interest-free payments of fortnightly

Qty

LOCAL PICKUP AVAILABLE:

56 Rosedale Street
Coopers Plains QLD 4108

Monday - Friday 9am - 4:30pm

PRODUCT INTRODUCTION

Enhance the silhouette and cooling efficiency of your Toyota Soarer Z30 with these Vertex Style Vented Front Guards. Designed for enthusiasts who want improved wheel clearance and a more aggressive stance without compromising structural integrity, these guards allow for superior fitment of wider wheel setups. The integrated ducting assists in dissipating heat from the wheel arches — a functional and aesthetic upgrade for both street and track builds. With over 20 years of experience in composite manufacturing, Monkey Warehouse produces these guards using FRP Hand Laid techniques, incorporating high-grade flex resin for maximum durability.

WHAT'S INCLUDED

  • 1 × Left Front Guard (FRP Hand-Laid)
  • 1 × Right Front Guard (FRP Hand-Laid)

COMPATIBILITY

  • Vehicle: Toyota Soarer / Lexus SC300 SC400
  • Chassis: Z30 Series (UZZ30, UZZ31, UZZ32, JZZ30, JZZ31)
  • Body Style: 2-Door Coupe
  • Years: 1991, 1992, 1993, 1994, 1995, 1996, 1997, 1998, 1999, 2000

Toyota Soarer Z30 Front Guards Vertex Style Vented Pair FRP Hand Laid

THE MONKEY WAREHOUSE ADVANTAGE

  • 20 Years of Heritage: Manufactured with two decades of refined composite expertise.
  • 100% Australian Made: Proudly manufactured in our Brisbane factory using local materials and workmanship.
  • Hand Laid Construction: Superior structural integrity — no "chopper gun" shortcuts used in mass production.
  • High Quality Composite Resin: Engineered for maximum durability and performance under the Australian sun.
  • Consistent Panel Thickness: Provides a reliable fitment and a solid feel compared to thin, flimsy imports.
  • Smooth Gel Coat Finish: Arrives in a white gel coat finish, providing a solid foundation ready for professional prep and paint.

ORDERING & MANUFACTURING TIME

We currently make to order to ensure the highest quality control for every item manufactured.

  • Production Time: Please allow approximately 2—3 weeks for manufacturing once payment is received.
  • Deadlines: If you have an upcoming car show or project deadline, please message us before purchasing.

SHIPPING & FREIGHT INFORMATION

Freight for this item is calculated automatically based on your location.

How to Purchase:
  • Check Postage: Simply enter your Postcode into the "Shipping Calculator" to see the automated rate for your area.
  • View Cart: Proceed through the "Checkout Now" as normal.
  • Payment: Complete payment immediately to begin the manufacturing process.

Note: Brisbane buyers can select Pick-up from Store and "Checkout Now".

INSTALLATION REQUIREMENTS

This is a high-quality aftermarket fibreglass (FRP) product. To achieve a professional finish, the following steps are mandatory before installation:

  • Pre-fitting: Always test-fit the part(s) to the vehicle before any modifications.
  • Custom Adjustment: As with most FRP components, professional cutting, heating, or moulding may be required to achieve a professional fit.
  • Preparation: This product arrives in a raw gel coat finish. It requires professional sanding, priming, and painting to match your vehicle's paint code.
IMPORTANT: We strongly recommend having this product installed by a qualified body shop experienced in FRP aero parts. Professional fitment ensures the correct seam lines and longevity of the paint finish.

FREQUENTLY ASKED QUESTIONS

Do these fit factory mounting points?
Yes, they are designed to follow the factory lines, though minor custom adjustments are standard for FRP parts to ensure perfect gaps.

Do they come pre-drilled?
No. To ensure the most accurate fitment for your specific chassis, we leave the final drilling to the installer.

What prep is required before painting?
Professional sanding and priming are essential to remove the release agent from the gel coat and ensure paint adhesion.